Welcome to the company ! we have many years of professional experience !
rsdzd@pyzyrsd.com +86 513525609655

Baking Soda Heartburn Relief

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 513525609655

E-Mail

rsdzd@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

Baking Soda Heartburn Relief
Specifications - Gateway to the Great Sand Dunes
Specifications - Gateway to the Great Sand Dunes

acceptable. The ,pump, shaft shall be AISI 416 SS turned and ground. The ,pump, shaft shall be supported by bronze bearings above and below each impeller. The ,suction, bell bearing shall be extra long and permanently grease packed and sealed with a bronze ,sand, collar. The main ,pump, shall be manufactured by Fairbanks Morse, Peerless or Goulds.

How to make a hand pump - CTA
How to make a hand pump - CTA

Suction valve, ... and serves as a ,structural, support and transmits the human force to the rest of the ,pump,. Access to clean water remains a priority in Africa, and improving access is key ... ,Sand, down the edge of the circle with the grinder. 2.2 ,Suction valve,. Cap

Specifications - Gateway to the Great Sand Dunes
Specifications - Gateway to the Great Sand Dunes

acceptable. The ,pump, shaft shall be AISI 416 SS turned and ground. The ,pump, shaft shall be supported by bronze bearings above and below each impeller. The ,suction, bell bearing shall be extra long and permanently grease packed and sealed with a bronze ,sand, collar. The main ,pump, shall be manufactured by Fairbanks Morse, Peerless or Goulds.

CIRIS - HMS
CIRIS - HMS

2. Built-in non-return ,valve, to prevent water hummer and reverse rotation 3. Octagonal bearings for ,sand, removal 4. AISI 420 stainless steel shaft 5. AISI 316 st ainless steel thick-tube stages casings for maximum ,structural, rigidity and damage prevention during installation and corrosion protection of ,pump, …

Installation of Domestic Water System HDPE uPVC Copper ...
Installation of Domestic Water System HDPE uPVC Copper ...

Mark the location the routing of the pipes base on approved ,drawing,. Pipe work must be installed as per approved ,drawing, clearances clearly indicated make sure the minimum clearances. The pipes must be cut off at right The pipes must cut using only the pipe cutter. Joints for uPVC sections should be sealed using Solvent Cement.

Matters needing attention in the use of deep well ...
Matters needing attention in the use of deep well ...

To protect the safe operation of the submersible ,pump,. 2. In order to prevent the rotor of the deep well submersible ,pump, from moving up instantly and reducing the starting load. When the submersible ,pump, is started, the outlet ,valve, stroke should be closed to 3/4. (Leave 1/4 air gap.

CIRIS - HMS
CIRIS - HMS

2. Built-in non-return ,valve, to prevent water hummer and reverse rotation 3. Octagonal bearings for ,sand, removal 4. AISI 420 stainless steel shaft 5. AISI 316 st ainless steel thick-tube stages casings for maximum ,structural, rigidity and damage prevention during installation and corrosion protection of ,pump, …

Pump FAQs
Pump FAQs

As the diaphragm/connecting rod assembly moves towards the wet end, the ,suction, check ,valve, closes and the discharge check ,valve, opens discharging liquid.A hydraulic coupled disc diaphragm liquid end (Figure 7.1.2.4a) contains a flexible, single or double configuration diaphragm, clamped at the periphery, and is in direct contact with the process liquid being displaced.

PPT – PUMPS TANKS PowerPoint presentation | free to view ...
PPT – PUMPS TANKS PowerPoint presentation | free to view ...

when ,vertical suction, pipe is used, eccentric reducers with the flat side on the bottom to avoid air pockets (which can cause cavitation in the ,pump,) should be used ; use flat side on top eccentric reducers in horizontal ,suction, ; to prevent backflow into the ,pump, on the discharge side, a check ,valve, should be place on the discharge nozzle

PPT – PUMPS TANKS PowerPoint presentation | free to view ...
PPT – PUMPS TANKS PowerPoint presentation | free to view ...

when ,vertical suction, pipe is used, eccentric reducers with the flat side on the bottom to avoid air pockets (which can cause cavitation in the ,pump,) should be used ; use flat side on top eccentric reducers in horizontal ,suction, ; to prevent backflow into the ,pump, on the discharge side, a check ,valve, should be place on the discharge nozzle

INVITATION OF BUDGETARY OFFER FOR SUPPLY INSTALLATION …
INVITATION OF BUDGETARY OFFER FOR SUPPLY INSTALLATION …

Drawing, of ,pump, house (tentative)- Annexure-2 ... positioned ,vertical, by means of ,structural, support. Accordingly, suitable section of steel ,structural, shall be selected to hold the riser firmly without any vibration of ... be provided at ,suction, line in the ,pump, inlet.

Indian Standard: DESIGN AND INSTALLATION OF FIXED ...
Indian Standard: DESIGN AND INSTALLATION OF FIXED ...

If the ,pump, is allowed to be installed above the level of its water supply, there shall be a foot ,valve, and a priming arrangement, the latter consisting of a tank (having a capacity at least three times that of the ,suction, pipe from the ,pump, to the foot ,valve,) connected to the delivery side of the ,pump, by a metal pipe having a minimum internal diameter of 100 mm in the case of centrifugal ...

Installation of Domestic Water System HDPE uPVC Copper ...
Installation of Domestic Water System HDPE uPVC Copper ...

Mark the location the routing of the pipes base on approved ,drawing,. Pipe work must be installed as per approved ,drawing, clearances clearly indicated make sure the minimum clearances. The pipes must be cut off at right The pipes must cut using only the pipe cutter. Joints for uPVC sections should be sealed using Solvent Cement.

Fire Pump Foundation
Fire Pump Foundation

Foundation bolts of suitable size should be embedded in the concrete located by a ,drawing, or template. Place pumping unit on foundation with wedges under base plate leaving approximately 3/4” space for grouting. Carefully level the unit by adjusting the wedges until shafts of ,pump, and driver are leveled, recreating factory alignment.

INVITATION OF BUDGETARY OFFER FOR SUPPLY INSTALLATION …
INVITATION OF BUDGETARY OFFER FOR SUPPLY INSTALLATION …

Drawing, of ,pump, house (tentative)- Annexure-2 ... positioned ,vertical, by means of ,structural, support. Accordingly, suitable section of steel ,structural, shall be selected to hold the riser firmly without any vibration of ... be provided at ,suction, line in the ,pump, inlet.

Pump FAQs
Pump FAQs

As the diaphragm/connecting rod assembly moves towards the wet end, the ,suction, check ,valve, closes and the discharge check ,valve, opens discharging liquid.A hydraulic coupled disc diaphragm liquid end (Figure 7.1.2.4a) contains a flexible, single or double configuration diaphragm, clamped at the periphery, and is in direct contact with the process liquid being displaced.

Matters needing attention in the use of deep well ...
Matters needing attention in the use of deep well ...

To protect the safe operation of the submersible ,pump,. 2. In order to prevent the rotor of the deep well submersible ,pump, from moving up instantly and reducing the starting load. When the submersible ,pump, is started, the outlet ,valve, stroke should be closed to 3/4. (Leave 1/4 air gap.

Chat Online Inquiry Email

Business cooperation

+86 513525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City