Welcome to the company ! we have many years of professional experience !
rsdgj@pyzyrsd.com +86 513525609655

sand belt

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 513525609655

E-Mail

rsdgj@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

sand belt
PUMPING STATION SPECIFICATIONS Lift Rail™ Page 1 of 4
PUMPING STATION SPECIFICATIONS Lift Rail™ Page 1 of 4

flange shall be mounted at the bottom of the ,vertical, pump discharge piping. The pump shall be raised and lowered into position by a telescopic hoist assembly. Galvanized schedule forty steel guide rails shall direct the pump and movable flange to the proper position for interconnection to the stationary receiving flange. The mating flanges shall

Vertical Turbine Pump VTF (VS4) - China Pump Manufacturers ...
Vertical Turbine Pump VTF (VS4) - China Pump Manufacturers ...

21/3/2021, · VS4 type is ,vertical, sump pump (sometimes called ,vertical, Submerged pump) with centrifugal impeller, VS4 ,Vertical, type Sump pump is completely according to application and performance request. which performance data can meet with ISO2858 and ISO 5199,The VS4 ,vertical, sump pump is driven by standard motor IM V1.

(PDF) Procedure for Conducting Pumping Tests
(PDF) Procedure for Conducting Pumping Tests

The basic principle of a ,pumping, test is that if we pump water from a well and measure the ,pumping, rate and the drawdown in the well, then substitute these measurements into an appropriate formula ...

46. Design drawings and technical specifications
46. Design drawings and technical specifications

equipment, mechanical, electrical, ,structural,, and water supply systems are designed and depicted through coordinated scale drawings and detailed elevations and plans. The lot feeder may engage consultants to ensure well-coordinated drawings and bill of quantities are prepared. Technical specifications are prepared to provide consistency and

Building Materials Flashcards | Quizlet
Building Materials Flashcards | Quizlet

Strength. This is always done two floors below the floor you are pouring (industry standard). formwork. ,Vertical, control joints, spaced at __________ times the thickness of the wall, can be formed in the wall to organize and conceal shrinkage cracks. 24 to 30 times.

Effect of structure and lithological heterogeneity on the ...
Effect of structure and lithological heterogeneity on the ...

Discovering of groundwater aquifer along the main wadi called Wadi Om Dehas especially to the Far East, adds to determine the main lithology, shaly sandstone, sandstone and sandstone to limestone, of the aquifer and the complicated ,structural, setting at form of inferred faults by using VESs curves, were the main tenets at this study for studying their effects on the correlation coefficient (R 2) between the …

Vertical Turbine Pump VTF (VS4) - China Pump Manufacturers ...
Vertical Turbine Pump VTF (VS4) - China Pump Manufacturers ...

21/3/2021, · VS4 type is ,vertical, sump pump (sometimes called ,vertical, Submerged pump) with centrifugal impeller, VS4 ,Vertical, type Sump pump is completely according to application and performance request. which performance data can meet with ISO2858 and ISO 5199,The VS4 ,vertical, sump pump is driven by standard motor IM V1.

FIXED SCHEDULE OF RATES - Sentosa
FIXED SCHEDULE OF RATES - Sentosa

handpacking ,vertical, edges or haunchings, forming splayed edges and the like, blinding with ,sand,, quarry waste or similar fine materials and consolidation in layers not exceeding 300mm thick.

Chapter 7. Preparation of Plans and Cost Estimates and ...
Chapter 7. Preparation of Plans and Cost Estimates and ...

(iii) Contour map Contour maps used in design of the facilities of the project must show the contour lines and all the establishments found at the proposed site such as roads, electric and telephonic lines, rivers and drains or other channels, buildings, underground oil, gas or water supply pipelines, borrow pits, boundary lines, including the location of the PBRs and the TBMs, the north ...

FIXED SCHEDULE OF RATES - Sentosa
FIXED SCHEDULE OF RATES - Sentosa

handpacking ,vertical, edges or haunchings, forming splayed edges and the like, blinding with ,sand,, quarry waste or similar fine materials and consolidation in layers not exceeding 300mm thick.

PUMPING STATION SPECIFICATIONS Lift Rail™ Page 1 of 4
PUMPING STATION SPECIFICATIONS Lift Rail™ Page 1 of 4

flange shall be mounted at the bottom of the ,vertical, pump discharge piping. The pump shall be raised and lowered into position by a telescopic hoist assembly. Galvanized schedule forty steel guide rails shall direct the pump and movable flange to the proper position for interconnection to the stationary receiving flange. The mating flanges shall

Page 1 of 11
Page 1 of 11

(b)- Electric Motor: Shall be a ,vertical, hollow shaft 3 phase induction motor with enclosed fan cooling (squirrel cage) with maximum speed n= 1500 r.p.m. rated at an output power for each well according to the BoQ, Supply voltage =380Vrms, 50Hz, Efficiency>90%, P.F>0.87.

46. Design drawings and technical specifications
46. Design drawings and technical specifications

equipment, mechanical, electrical, ,structural,, and water supply systems are designed and depicted through coordinated scale drawings and detailed elevations and plans. The lot feeder may engage consultants to ensure well-coordinated drawings and bill of quantities are prepared. Technical specifications are prepared to provide consistency and

Chapter 7. Preparation of Plans and Cost Estimates and ...
Chapter 7. Preparation of Plans and Cost Estimates and ...

(iii) Contour map Contour maps used in design of the facilities of the project must show the contour lines and all the establishments found at the proposed site such as roads, electric and telephonic lines, rivers and drains or other channels, buildings, underground oil, gas or water supply pipelines, borrow pits, boundary lines, including the location of the PBRs and the TBMs, the north ...

(PDF) Design and Construction Considerations for Offshore ...
(PDF) Design and Construction Considerations for Offshore ...

Global cumulative offshore wind capacity in 2017, (GWEC 2017) A small change in design or construction process can have significant impact on these type of constructions in terms of cost and ...

Building Materials Flashcards | Quizlet
Building Materials Flashcards | Quizlet

Strength. This is always done two floors below the floor you are pouring (industry standard). formwork. ,Vertical, control joints, spaced at __________ times the thickness of the wall, can be formed in the wall to organize and conceal shrinkage cracks. 24 to 30 times.

Unit 1: Construction Technology - Scheme of Work (Version ...
Unit 1: Construction Technology - Scheme of Work (Version ...

stress grading of ,structural, timber. mortar testing. Specifications for the quality of materials: British Standards (EN) European numbers. the strength classifications of concrete, bricks, blocks, mortar and timber. The construction of cavity walls. Lateral and ,vertical, restraint. Transfer of loads to foundations: roof to walls, floors to walls.

Chat Online Inquiry Email

Business cooperation

+86 513525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City